The unusual design of using raised flooring throughout the space and installing mechanical and electrical distribution below the floor presented unique challenges in construction scheduling.
Mandate:
General Contractor
Category:
Legacy
Year:
2004
Schedule:
3 months (2004)
Area:
34,000 sq. ft.
Client:
SITQ
Location:
CDP Capital Centre, Montreal
Owner:
SITQ
Designer:
Moureaux Hauspy + Associés designers
Photographer:
Claude-Simon Langlois