Mandate:
Construction Management
Category:
Construction Management
Year:
2010
Schedule:
Phase 2 (2008), Phase 3 (2010)
Area:
20,000 sq. ft.
Client:
Eidos–Montreal
Location:
400 de Maisonneuve Blvd.W., Montreal, Quebec. 6th floor
Owner:
Sidev
Designer:
Moureaux Hauspy + Associés designers
"In hindsight, I can say that we met the challenge with flair! Indeed, in only 9 weeks, we transformed our 9,000 sq. ft. into a remarkable workspace. I would like to emphasize my appreciation of your matchless efficiency and your employees’ professionalism. Without them it would have been impossible to succeed with so much style."
- Stéphane D’Astous, MBA, PM, General Director, Eidos-Montreal.