Project

Eidos 2010

Mandate: Construction Management
Category: Construction Management
Year: 2010
Schedule: Phase 2 (2008), Phase 3 (2010)
Area: 20,000 sq. ft.
Client: Eidos–Montreal
Location: 400 de Maisonneuve Blvd.W., Montreal, Quebec. 6th floor
Owner: Sidev
Designer: Moureaux Hauspy + Associés designers
"In hindsight, I can say that we met the challenge with flair! Indeed, in only 9 weeks, we transformed our 9,000 sq. ft. into a remarkable workspace. I would like to emphasize my appreciation of your matchless efficiency and your employees’ professionalism. Without them it would have been impossible to succeed with so much style."
- Stéphane D’Astous, MBA, PM, General Director, Eidos-Montreal.